Dedicated Purified Water and Mixing Systems for a Russian Pharmaceutical Company
- Project Country: Russia
- Completion year: 2023
- Capacity: 2t/h
The client, an integrated pharmaceutical company from Moscow, Russia, needed dedicated purified water and mixing systems for their newly-built liquid oral dosage production floor. The purified water system and mixing tank are required to work in synchronization for centralized management.
Solutions
- Purified water generation: two-stage reverse osmosis (RO) + electrodeionization (EDI), 2 t/h
- Stainless steel purified water storage tank, 3,000L working capacity
- Stainless steel mixing tank with mixing, heating and weighing modules
- Centralized control panel for purified water and mixing systems
Details
The purified water system supply water directly to the mixing unit with water volume automatically adjusted to the mixing process. The centralized control allows operators to manage the entire system from the mixing room.
Achievements
- The purified water system and the mixing system works in synchronization, significantly increasing production efficiency.
- The mixing precision meets the requirements of liquid dosage production.
- The systems operate smoothly under extreme winter conditions and without fail throughout the year.
- The project was delivered on time and well-received by the client for the integrated system.



